CompletedA list of our previous achievements.



Aircraft control tower

Period of realization: 03/2022 - 05/2022
Range: Detailed design of the BMS system.



Szablak barn

Period of realization: 12/2021 - 12/2022
Range: Design and implementation of automation and electrical installations.



Czartoria house

Period of realization: 11/2021 - 04/2022
Range: Design and implementation of automation and electrical installations.



Chemical reactors of pharmaceutical lines

Period of realization: 11/2021 - 02/2022
Range: DCS and compressed air installation design for 3 reactors of pharmaceutical lines.



Ikar Hotel

Period of realization: 11/2021 - 12/2021
Range: Development of technical documentation for the BMS and I&C system - detailed design.



Wieniawa Hotel

Period of realization: 10/2021 - 12/2021
Range: Development of technical documentation for the BMS and I&C system - detailed design.



Metal-Fach

Period of realization: 09/2021 - 05/2022
Range: Design and delivery of an air conditioning system based on Siemens controllers.



Compressed air installation for biotechnology line

Period of realization: 10/2022 - 11/2022
Range: Development of technical documentation for compressed air installation - detailed design.



Municipal Water and Sewerage Company in Łomża MPWiK.

Period of realization: 08/2020 - during
Range: Modernization and expansion of the wastewater treatment plant in the scope of I&C and DCS installation.



FOREST HB Reavis Poland

Period of realization: 01/2020 - 05/2020
Range: Visualization of the BMS system based on the Siemens DesigoCC platform.



Varso Tower HB Reavis Poland

Period of realization: 06/2020 - 01/2021
Range: Comprehensive supply of automation of the heat distribution plant. Solution based on Siemens PXC controllers.



GALERIA VENEDA Shopping Center.

Period of realization: 11/2020 - 01/2021
Range: Expansion of the BMS and DELTA Controls systems.



"Brintons AGNELLA" Sp. z o.o. Carpet factory, Białystok.

Period of realization: 10/2020 - 01/2021
Range: Connection and installation of the control system of reallocated dyeing apparatuses.



Hotel Best Western Plus, Warszawa

Period of realization: 10/2019 - 08/2020
Range: Design and delivery of a BMS system. A solution based on the Honeywell Niagara NX platform.



"Brintons AGNELLA" Sp. z o.o. Carpet factory, Białystok

Period of realization: 12/2019 - 05/2020
Range: Design and delivery of the BMS and AKPiA systems. A solution based on Siemens controllers and the DesigoCC platform.



MPEC, Łomża

Period of realization: 08/2019 - 12/2020
Range: Supply of the I&C installation for a new 12.5MW biomass-powered water boiler.



Varso CHM2, Warszawa

Period of realization: 12/2019 - 05/2020
Range: Visualization of the BMS system based on the Siemens DesigoCC platform.



P.S. Teatr, Sękocin Nowy

Period of realization: 06-12/2019
Range: Design and delivery of BMS, KNX and I&C systems. A solution based on ABB and Centraline controllers and the Honeywell Niagara NX platform.



Museum of Józef Piłsudzki, Sulejówek

Period of realization: 06-12/2019
Range: Visualization of the BMS system based on the Siemens DesigoCC platform.



Warsaw subway station C-06, Warszawa

Period of realization: 07-12/2019
Range: Installation of HVAC automation installations.



Uniqa, Łódź

Period of realization: 06-11/2019
Range: Design and delivery of BMS and I&C systems. Solution based on Siemens drivers and DesigoCC platform.



Mennica Legacy Tower, Warszawa

Period of realization: 01-10/2019
Range: Comprehensive supply of automation of the heat distribution plant. Solution based on Honeywell SAIA drivers.



Sendzimira Ironworks, Kraków

Period of realization: 01-05/2019
Range: Modernization of the coke oven gas suction control system.



Base Camp Dormitory, Katowice

Period of realization: 03-04/2019
Range: Preparation of technical documentation for the BMS and I&C system - executive design.



JP Morgan, Warszawa

Period of realization: 05-07/2019
Range: Comprehensive supply of water leak detection installations.

<11:45 2022-12-21/div>


Hotel MOXY (Marriott), Lublin

Period of realization: 6-12/2019
Range: Preparation of technical documentation for the BMS and I&C system - executive design.



Hotel MOXY (Marriott), Poznań

Period of realization: 01-05/2018
Range: Preparation of technical documentation for the BMS and I&C system - executive design.



Ogrodowa Office, Łodź

Period of realization: 04/2018 - 02/2020
Range: Comprehensive implementation of the comfort control installation on the leasable area. A solution based on Siemens controllers and the DesigoCC platform.



Glassworks Euroglas, Tomaszów Mazowiecki

Period of realization: 12/2018
Range: Installation works related to the float bath process control system..



AT office building with a hall, Krotoszyn

Period of realization: 10/2018 - 01/2019
Range: Design and delivery of the BMS system. System based on MPM and AS drivers and Schneider Electric's StruxureWare software.



CEDET, Warsaw

Period of realization: 10/2017 - 05/2019
Range: Design and delivery of the BMS system. The solution based on SAIA-Burgess Controls drivers and the Niagara NX distribution platform from Honeywell.



Auditorium building on the central campus of the University of Warsaw

Period of realization: 07/2016 - 10/2017
Range: Design and delivery of the BMS system. A solution based on GC5 controllers and the Honeywell Niagara 4 platform.



Installation of unloading of rail tankers and loading of road tankers, Composition of fertilizers in Ostrów Mazowiecka

Period of realization: 06-08/2017
Range: Comprehensive delivery of the I&C system for the unloading and reloading station of the RSM solution.



Use of waste heat on the Hydrocracking installation, PKN Orlen Płock - Stage 1

Period of realization: 06-08/2017
Range: Modernization of the installation. Electrical connections of the control and control cabinet. Installation of the I&C installation using aplinistic techniques.



Installation of butter melting, Mondelez in Płońsk

Period of realization: 06-07/2017
Range: Performing the automation of butter melting line. Expansion of the installation.



Silver remelting line, Copper Smelter in Głogów - Stage 1

Period of realization: 06/2017
Range: Modernization of the installation. Electrical connections of the control and control cabinet.



Power station, Rybnik

Period of realization: 04-05/2017
Range: Electrical connections of the control and control cabinet.



Position for unloading road tankers, PKN Orlen Płock

Period of realization: 01-04/2017
Range: Comprehensive delivery of the I&C system for DMF and Furfural unloading stations on the butadiene separation plant. The scope included programming and extending the object's DCS system.



Hotel MOXY (Marriott), Katowice

Period of realization: 03-04/2017
Range: Preparation of technical documentation for the BMS and I&C system - executive design.



Complex of multi-family buildings at Płochocińska street, Warsaw

Period of realization: 11/2016 - 02/2017
Range: Comprehensive delivery of a carbon monoxide detection system and ventilation control (GAZEX).



Maraton, Poznań

Period of realization: 07/2016 - 01/2017
Range: Comprehensive implementation, including delivery of materials, I&C and BMS (Johnson Controls).



National Stadium, Warsaw

Period of realization: 07/2015 - 01/2017
Range: Provision of services in the field of service and review of BMS and I&C installations.



Power Plant EC Nowa, Dąbrowa Górnicza

Period of realization: 06/2015 - 12/2016
Range: Disassembly of the old and assembly of the new boiler I&C installation in ZW Nowa.



CBD1, Warsaw

Period of realization: 09-10/2016
Range: Preparation of technical documentation for the BMS and I&C system - tender and executive design.



Factory of candles JAREX, Grajewo

Period of realization: 12/2015 - 09/2016
Range: Comprehensive implementation of I&C systems for new production lines, packaging and transport of candles - STAGE I.



ASTORIA, Warsaw

Period of realization: 08/2015 - 07/2016
Range: Comprehensive implementation of the automation system for aeration of corridors and staircases. Installation of the installation using climbing techniques.



Power Plant EC Siekierki, Warsaw

Period of realization: 04/2016 - 07/2016
Range: Installation of the I&C system for the fly ash separator.



CEDET, Warsaw

Period of realization: 04-06/2016
Range: Preparation of technical documentation for the BMS and I&C system - executive design.



Police Headquarters building 6,7, Warsaw

Period of realization: 07/2015 - 06/2016
Range: Design and delivery of the BMS system for two KGP buildings. System based on MPM and AS drivers and Schneider Electric's StruxureWare software.



National Archives in Gdańsk

Period of realization: 12/2015 - 03/2016
Range: Design and delivery of BMS and I&C systems for ventilation and VAV units. A solution based on SAIA-Burgess Controls and Centraline controllers and the Niagara AX distribution platform from Honeywell.



Poultry hatchery, Stoczek

Period of realization: 10/2015 - 03/2016
Range: Design and delivery of the BMS system. Control solutions from SAIA-Burgess Controls and the Niagara AX distribution platform from Honeywell.



Production hall of the Mint of Poland, Warsaw

Period of realization: 07/2015 - 02/2016
Range: Design and delivery of the BMS system. The solution is based on SAIA-Burgess Controls drivers and the Honeywell Niagara AX distribution platform.



Academic Entrepreneurship Incubators, National Stadium in Warsaw

Period of realization: 12/2015 - 01/2016
Range: Comprehensive implementation, including delivery of materials, I&C and BMS (Schneider Electric).



ICM OCEAN, Warsaw

Period of realization: 11/2015 - 01/2016
Range: Programming of BMS and I&C system controllers (SAIA Burgess).



Universal rewinder for fabrics

Period of realization: 11/2015 - 12/2015
Range: Design and implementation of an automated rewinder for fabrics of various types.



Ministry of Treasury, Warsaw

Period of realization: 09/2015 - 11/2015
Range: Design and delivery of the BMS system. The solution is based on SAIA-Burgess Controls drivers and the Honeywell Niagara AX distribution platform.



PCC Rokita, Brzeg Dolny

Period of realization: 08/2015 - 09/2015
Range: installation of high-current wiring. Installation of cable routes.



Turbogenerator 87MWe in Mondi Świat S.A.

Period of realization: 04/2015 - 06/2015
Range: Support for electrical connection of control cabinets and I&C equipment, assembly of cable routes and cabling.



Laboratory Stem Cells Spin S.A., Wrocław

Period of realization: 02/2015 - 03/2015
Range: Comprehensive implementation of the RMS and BMS system of laboratory rooms. A system based on two StruxureWare servers from Schneider Electric.



WarsawSpire Building, Warsaw - server room Frontex

Period of realization: 12/2014 - 01/2015
Range: Comprehensive supply of hydrogen detection system, control of UPS chargers and additional ventilating ventilation of the UPS room. The solution based on the Siemens SIMATIC S7-1200 controller connected to the DCIM system.



Student`s house no. 4, UMED in Łódź

Period of realization: 08-12/2014
Range: Comprehensive implementation of the BMS system, automatic temperature control in the student's rooms (Schneider Electric VISTA, Xenta); Installation of access control system.



Heat node in Shopping Center Złote Tarasy

Period of realization: 10-11/2014
Range: Reconstruction of the heat node automation installation (Andover Continuum).



Warsaw University of Technology, WEiTI

Period of realization: 09-10/2014
Range: Comprehensive delivery of BMS based on Niagara AX Distech Controls.



IKEA Bydgoszcz

Period of realization: 06/2014
Range: Preparation of technical description and functional diagrams of the I&C installations - tender design.



Energetic efficiency

Period of realization: 01-08/2014
Range: Provision of engineering services.



Clinical and Didactic Center of the Medical University of Łódź

Period of realization: 02/2013 - 01/2014
Range: Implementation of the BMS graphic user interface and its configuration (Schneider Electric VISTA).



Complex of multi-family buildings at Szczupacza street in Warsaw

Period of realization: 11-12/2013
Range: Comprehensive delivery of a carbon monoxide detection system and ventilation ventilation control (GAZEX).



Municipal Office in Zwoleń

Period of realization: 05-08/2013
Range: Implementation of the BMS graphic user interface and its configuration (Schneider Electric StruxureWare).



Independent Public Health Care Center in Hrubieszów

Period of realization: 05-09/2013
Range: Comprehensive delivery of the automation system (Siemens) of the HVAC installation for the needs of the operating block
and maternity ward.



Specialist Hospital of Saint. Luke in Końskie

Period of realization: 03/2013
Range: Installation of the automation system (Carel) for 5 air handling units that support the operating block.



Chemical Reactor

Period of realization: 02-03/2013
Range: Comprehensive delivery of chemical reactor control system based on Siemens SIMATIC S7-1200 controller + HMI panel.



Traumatic Center in Sosnowiec

Period of realization: 02-04/2013
Range: Installation of low voltage installations on the surface of the operating block and hospital emergency ward;
Installation of BMS installation (a system based on TECHBASE solutions);
Installation of media consumption monitoring system;
Installation of medical gas monitoring system.

© 2021 Automatyka Wschód. All rights reserved.